Client: LIRR
Address: Harrison Ave. Mineola, NY 11501
Duration/Schedule: 2 years
Square Footage: 5 Tier, 272,000 SQ ft
Contractor/Construction Manager: 3rd Track Construction
Architect: Asif Syed
Engineer: Walker Engineering
Project Description: As part of the LIRR Expansion Project from Floral Park to Hicksville, a new five-level, 551-space parking garage will be constructed at Mineola Station west of Mineola Boulevard between Harrison Avenue and First Street, replacing the surface parking area. The new garage will represent a net increase of 446 parking spaces serving the Mineola Station. The new garage will serve both LIRR commuters and Downtown Mineola. Consistent with Mineola’s most recent parking study, the new parking structure will help accommodate a future increase in capacity on the LIRR.